Construction Method and Period
Construction method Contents Features incidental construction
standard method short-term method
System replacement work Replacement of control panel and electric parts 7 days 5 days Not applicable
Division replacement work Reuse and replacement of some parts (rail, counterweight, shock absorber, door frame) 22 days 18 days Construction incidental construction occurred
front part construction Front demolition replacement work 30 days 22 days Massive construction incidental construction
The above schedule may be slightly changed depending on the site. Standard method: The work is carried out according to the standard process.
Short-term construction method: This is an option, and additional costs are incurred due to night work.
Selection of replacement work
Substitute
Recycle
Division Item System replacement Type change Partial replacement Full replacement Characteristic
machine room Panel
COMPACT, MICOMized Inverter dedicated motor
Whim
Drive motor
CAR CAR FRAME
Ergonomic Design Inverter Control
Operation panel
C.P.I
CAR PANEL
DOOR
DOOR/M.C
HALL JAMB/SILL
LATEST DESIGN
Button/Indicator
DOOR
Hoistway Driving cable
WIRE/FB
RAIL/BUFFER